BEIN Engineering product launch – Lay back and enjoy!
One of the most influential parameters in a submarine cable installation operation is the LAYBACK distance. This is the horizontal …
One of the most influential parameters in a submarine cable installation operation is the LAYBACK distance. This is the horizontal …
Critical and important infrastructure We like to take for granted that the morning coffee is hot, that we can use …
ZeFF – Zero emission Fast Ferry BEIN Engineering was awarded the responsibility for the design and development of the power …
BEIN Engineering recently worked together with PartnerPlast AS on an interesting project. We delivered design and engineering solutions for of …
BEIN Engineering has had the pleasure of assisting the National Theatre (Nationaltheatret) with construction drawings, technical solutions and structural calculations …
Engineers are needed everywhere. Thanks to decades of concept development, detail-design and production of various mechanical solutions for the on- …
3D visualization is a great tool for selling and market new buildings. Potential customers will immediately understand how the build …
3D visualization combined with video and audio is a great way to present products, projects, companies and ideas. It is …
The Directorate for Civil Protection and Emergency Planning (DSB), together with the Petroleum Safety Authority Norway (PSA), has adopted new …
BEIN Engineering’s Bellmouths with ROV design have been installed at a subsea location. This design is easy to install and …